Project details
On the existing building, we needed a small canopy with a low build-up height. We had to execute the wall junction watertight. The area was limited and required precisely fitting cuts.
We cut the profiled sheets and aligned them according to the laying plan. We fixed them with suitable screws and sealing washers. We sealed junctions and overlaps and formed the eaves edge cleanly.
We created weather protection for the entrance/access area on a small roof surface. We achieved a tight connection to the existing structure and a robust covering. We delivered a low-maintenance solution with clear lines.
We use profiled sheeting for small canopies especially when low build-up height and a fast, watertight connection to the existing building are required.